k Tethered satellite deployment. View of the second Tethered Satellite System TSS2 at the start of its deployment. The supportive boom is seen. TSS2 was designed to be reeled out to 20 kilometres from Shuttle Columbia in orbit. The purpose was to investigate the possibilities of generating electricity as the conducting tether passed through the Earths magnetic field. Unfortunately, when reeled out to about 10 kilometres the tether broke and the satellite was lost. This followed a previously aborted mission in 1992 when the tether reeling mechanism jammed. NASA did, however, gather data from the experiment. TSS2 was carried on Mission STS75 of 22 February to 9 March 1996. Editorial Stock Photo - Afloimages
Sign up
Login
All images
Tethered satellite deployment. View of the second Tethered Satellite System (TSS-2) at the start of its deployment. The supportive boom is seen. TSS-2 was designed to be reeled out to 20 kilometres from Shuttle Columbia in orbit. The purpose was to investigate the possibilities of generating electricity as the conducting tether passed through the Earth's magnetic field. Unfortunately, when reeled out to about 10 kilometres the tether broke and the satellite was lost. This followed a previously aborted mission in 1992 when the tether reeling mechanism jammed. NASA did, however, gather data from the experiment. TSS-2 was carried on Mission STS-75 of 22 February to 9 March 1996.
ED

Tethered satellite deployment. View of the second Tethered Satellite System (TSS-2) at the start of its deployment. The supportive boom is seen. TSS-2 was designed to be reeled out to 20 kilometres from Shuttle Columbia in orbit. The purpose was to investigate the possibilities of generating electricity as the conducting tether passed through the Earth's magnetic field. Unfortunately, when reeled out to about 10 kilometres the tether broke and the satellite was lost. This followed a previously aborted mission in 1992 when the tether reeling mechanism jammed. NASA did, however, gather data from the experiment. TSS-2 was carried on Mission STS-75 of 22 February to 9 March 1996.

Details

ID
10631006

Collection

License type
Editorial

Photographer

Creation date
22-11-2010

Contact Aflo for all commercial uses.


Keywords
More
Sign in
Member access
Login not found.