k Thames flood control barrier The metalclad cupolas and yellowpainted lifting gear of the Thames Flood Barrier, Woolwich, London. Officially opened in 1984, the project took 8 years to complete and cost nearly 500 million. The barrier consists of 10 moveable D shaped gates supported by 9 concrete piers, each containing the hydraulic machinery which lifts the gates into position. When not in use the gates rest in concrete sills on the bed of the river, causing no hindrance to river traffic. Stock Photo - Afloimages
Sign up
Login
All images
Thames flood control barrier The metal clad cupolas and yellow painted lifting gear of the Thames Flood Barrier, Woolwich, London. Officially opened in 1984, the project took 8 years to complete and cost nearly  500 million. The barrier consists of 10 moveable D  shaped gates supported by 9 concrete piers, each containing the hydraulic machinery which lifts the gates into position. When not in use the gates rest in concrete sills on the bed of the river, causing no hindrance to river traffic.
RM

Thames flood control barrier

The metal-clad cupolas and yellow-painted lifting gear of the Thames Flood Barrier, Woolwich, London. Officially opened in 1984, the project took 8 years to complete and cost nearly #500 million. The barrier consists of 10 moveable D- shaped gates supported by 9 concrete piers, each containing the hydraulic machinery which lifts the gates into position. When not in use the gates rest in concrete sills on the bed of the river, causing no hindrance to river traffic.

Details

ID
158121260

Collection

License type
Rights Managed

Photographer



Sign in
Member access
Login not found.