k Twin hull barge, Woolston, City of Southampton, 21061978. Creator John Laing plc. A twin hull barge being towed down river from Woolston, Hampshire, for use in the construction of the Peel Common Sewage Works outfall at Browndown. Laing Civil Engineering were contracted to construct the Browndown Outfall for the Southern Water Authority, as part of the South Hampshire Main Drainage Scheme for the treatment and disposal of sewage. Browndown Outfall is a 1km long underwater culvert which transports treated sewage from Peel Common Sewage Works, another contract carried out by Laing. The outfall was built in sections which were linked together in a chain on the seabed. The landward section of the outfall was cast insitu in a temporary cofferdam. Editorial Stock Photo - Afloimages
Sign up
Login
All images
Twin hull barge, Woolston, City of Southampton, 21 06 1978. Creator: John Laing plc. A twin hull barge being towed down river from Woolston, Hampshire, for use in the construction of the Peel Common Sewage Works outfall at Browndown. Laing Civil Engineering were contracted to construct the Browndown Outfall for the Southern Water Authority, as part of the South Hampshire Main Drainage Scheme for the treatment and disposal of sewage. Browndown Outfall is a 1km long underwater culvert which transports treated sewage from Peel Common Sewage Works, another contract carried out by Laing. The outfall was built in sections which were linked together in a chain on the seabed. The landward section of the outfall was cast in situ in a temporary cofferdam.
ED

Twin hull barge, Woolston, City of Southampton, 21/06/1978. Creator: John Laing plc.

A twin hull barge being towed down river from Woolston, Hampshire, for use in the construction of the Peel Common Sewage Works outfall at Browndown. Laing Civil Engineering were contracted to construct the Browndown Outfall for the Southern Water Authority, as part of the South Hampshire Main Drainage Scheme for the treatment and disposal of sewage. Browndown Outfall is a 1km long underwater culvert which transports treated sewage from Peel Common Sewage Works, another contract carried out by Laing. The outfall was built in sections which were linked together in a chain on the seabed. The landward section of the outfall was cast in-situ in a temporary cofferdam.

Details

ID
170826007

Collection

License type
Editorial

Photographer

Creation date
01-10-2021

Contact Aflo for all commercial uses.


Keywords
More
Sign in
Member access
Login not found.