k 3 Minster Court, Mincing Lane, City of London, 01101993. Creator John Laing plc. 3 Minster Court, Mincing Lane, City of London, 01101993. A view of 3 Minster Court, taken from the southeast across Great Tower Street. In October 1990, Laingx2019s London division were awarded the contract for the fitting out of the new London Underwriting Centre at No.3 Minster Court. Key parts of the contract included altering steelwork to enable 16 escalators to be suspended in the atrium, creating dining and kitchen areas on the mezzanine level and the installation of raised floors and suspended ceilings. In August 1991, the team faced a huge setback as the site was severely damaged by fire. The flames swept through the central atrium and burst through the roof. A new Laing team was formed to restore the building after the disaster, and work was finally completed in late 1993. Editorial Stock Photo - Afloimages
Sign up
Login
All images
3 Minster Court, Mincing Lane, City of London, 01 10 1993. Creator: John Laing plc. 3 Minster Court, Mincing Lane, City of London, 01 10 1993. A view of 3 Minster Court, taken from the south east across Great Tower Street. In October 1990, Laing  x2019 s London division were awarded the contract for the fitting out of the new London Underwriting Centre at No.3 Minster Court. Key parts of the contract included altering steelwork to enable 16 escalators to be suspended in the atrium, creating dining and kitchen areas on the mezzanine level and the installation of raised floors and suspended ceilings. In August 1991, the team faced a huge setback as the site was severely damaged by fire. The flames swept through the central atrium and burst through the roof. A new Laing team was formed to restore the building after the disaster, and work was finally completed in late 1993.
ED

3 Minster Court, Mincing Lane, City of London, 01/10/1993. Creator: John Laing plc.

3 Minster Court, Mincing Lane, City of London, 01/10/1993. A view of 3 Minster Court, taken from the south-east across Great Tower Street. In October 1990, Laing’s London division were awarded the contract for the fitting out of the new London Underwriting Centre at No.3 Minster Court. Key parts of the contract included altering steelwork to enable 16 escalators to be suspended in the atrium, creating dining and kitchen areas on the mezzanine level and the installation of raised floors and suspended ceilings. In August 1991, the team faced a huge setback as the site was severely damaged by fire. The flames swept through the central atrium and burst through the roof. A new Laing team was formed to restore the building after the disaster, and work was finally completed in late 1993.

Details

ID
178609954

Collection

License type
Editorial

Photographer

Creation date
18-01-2022

Contact Aflo for all commercial uses.


Keywords
More
Sign in
Member access
Login not found.