k Vintners Place, Upper Thames Street, Queenhithe, London, 01101990. Creator John Laing plc. Vintners Place, Upper Thames Street, Queenhithe, London, 01101990. A worker being lowered by crane into the steel casing of one of the bored pile foundations at Vintners Place to undertake an inspection. Laing undertook the xa379m management contract for the construction of a 37,000sqm high quality office development at Vintners Place between March 1989 and December 1992. Work on site began in June 1989 with the demolition of 10 buildings including Vintry House and Kennet Wharf on the riverside. The listed faxe7ade of Thames House along Queen Street Place was preserved and incorporated into the development. The project was the first within the City of London in modern times permitted to reclaim land from the Thames foreshore for its riverside facade. 319 secant piles were bored for the perimeter foundation wall with 90 large diameter underreamed piles for the main foundations and 84 contiguous piles within the coffer dam. Editorial Stock Photo - Afloimages
Sign up
Login
All images
Vintners Place, Upper Thames Street, Queenhithe, London, 01 10 1990. Creator: John Laing plc. Vintners Place, Upper Thames Street, Queenhithe, London, 01 10 1990. A worker being lowered by crane into the steel casing of one of the bored pile foundations at Vintners Place to undertake an inspection. Laing undertook the   xa3 79m management contract for the construction of a 37,000sqm high quality office development at Vintners Place between March 1989 and December 1992.  Work on site began in June 1989 with the demolition of 10 buildings including Vintry House and Kennet Wharf on the riverside.  The listed fa  xe7 ade of Thames House along Queen Street Place was preserved and incorporated into the development.  The project was the first within the City of London in modern times permitted to reclaim land from the Thames foreshore for its riverside facade.  319 secant piles were bored for the perimeter foundation wall with 90 large diameter under reamed piles for the main foundations and 84 contiguous piles within the coffer dam.
ED

Vintners Place, Upper Thames Street, Queenhithe, London, 01/10/1990. Creator: John Laing plc.

Vintners Place, Upper Thames Street, Queenhithe, London, 01/10/1990. A worker being lowered by crane into the steel casing of one of the bored pile foundations at Vintners Place to undertake an inspection. Laing undertook the £79m management contract for the construction of a 37,000sqm high quality office development at Vintners Place between March 1989 and December 1992. Work on site began in June 1989 with the demolition of 10 buildings including Vintry House and Kennet Wharf on the riverside. The listed façade of Thames House along Queen Street Place was preserved and incorporated into the development. The project was the first within the City of London in modern times permitted to reclaim land from the Thames foreshore for its riverside facade. 319 secant piles were bored for the perimeter foundation wall with 90 large diameter under-reamed piles for the main foundations and 84 contiguous piles within the coffer dam.

Details

ID
185600881

Collection

License type
Editorial

Photographer

Creation date
11-04-2022

Contact Aflo for all commercial uses.


Keywords
More
Sign in
Member access
Login not found.