k Seikan Tunnel Advanced shaft penetration Aomori, Hokkaido January 27, 1983 A tunnel is being bored under which the Seikan Line will pass.Prime Minister Nakasone presses a switch at the Prime Ministers Office on 1.27, and the tunnel blows through the middle point.President Misugi of Japan National Railways Editorial Stock Footage Video - Afloimages
Sign up
Login
All images
ED

Seikan Tunnel - Advanced shaft penetration = Aomori, Hokkaido (January 27, 1983)

A tunnel is being bored under which the Seikan Line will pass. Prime Minister Nakasone presses a switch at the Prime Minister's Office on 1.27, and the tunnel blows through the middle point. (President Misugi of Japan National Railways)

Details

ID
63453372

License type
Editorial

Photographer

Creation date
19-10-2017

Codec
H264
Frame rate
29.97
Duration
116.02
Contact Aflo for all commercial uses.


Sign in
Member access
Login not found.